| Assessment Year | 2001 |
|---|---|
| Principal Product | Aluminum Extrusions |
| NAICS |
n/a
|
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $50 M to 100M |
| # of Employees | 380 |
| Plant Area |
460,000
ft2
|
| Annual Production | 53,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $915,482 | 27,301,732 |
kWh
|
$0.034 |
| Natural Gas | $1,884,118 | 369,607 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $430,529 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,859 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $7,210 | - |
$7,210
215,250
kWh
|
- | - | - | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,380 | - | - |
$2,380
-
MMBtu
|
- | - | - | |
| 03 | 2.2514: Cover open tanks | $33,470 | $17,000 | - |
$33,470
-
MMBtu
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,725 | $28,875 |
$8,725
260,440
kWh
|
- | - | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $325,890 | $295,000 | - |
$325,890
-
MMBtu
|
- | - | - | |
| 06 | 3.5242: Recover metals from spent solutions and recycle | $51,100 | $95,000 | - | - |
$51,100
-
lb
|
- | - | |
| 07 | 3.1162: Use less wasteful packaging | $1,754 | - | - | - |
$2
-
lb
|
$57 | $1,695 | |
| TOTAL RECOMMENDED | $430,529 | $435,875 |
$15,935
475,690
kWh
|
$361,740
-
MMBtu
|
$51,102
-
lb
|
$57 | $1,695 | ||
| TOTAL IMPLEMENTED | $12,859 | $28,875 |
$8,725
260,440
kWh
|
$2,380
-
MMBtu
|
$2
-
lb
|
$57 | $1,695 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs