ITAC Assessment: GT0715
ITAC logo
ITAC Assessment: GT0715
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 460,000
ft2
Annual Production 53,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $915,482 27,301,732
kWh
Natural Gas $1,884,118 369,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $430,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $7,210 - $7,210
215,250
kWh
- - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,380 - - $2,380
-
MMBtu
- - -
03 2.2514: Cover open tanks $33,470 $17,000 - $33,470
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,725 $28,875 $8,725
260,440
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $325,890 $295,000 - $325,890
-
MMBtu
- - -
06 3.5242: Recover metals from spent solutions and recycle $51,100 $95,000 - - $51,100
-
lb
- -
07 3.1162: Use less wasteful packaging $1,754 - - - $2
-
lb
$57 $1,695
TOTAL RECOMMENDED $430,529 $435,875 $15,935
475,690
kWh
$361,740
-
MMBtu
$51,102
-
lb
$57 $1,695
TOTAL IMPLEMENTED $12,859 $28,875 $8,725
260,440
kWh
$2,380
-
MMBtu
$2
-
lb
$57 $1,695
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs