ITAC Assessment: GT0714
ITAC logo
ITAC Assessment: GT0714
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printed Towels
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 400,000
ft2
Annual Production 2,524,180
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,597 522,320
kWh
Electricity Demand $17,256 2,761
kW-mo/yr
Electricity Fees $1,825 -
Natural Gas $95,727 12,527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $630 $250 $351
6,412
kWh
$244
-
kW-mo/yr
$35 - - - -
02 3.4151: Minimize water usage $26,061 $350 - - - - $25,650
-
Tgal
- $411
-
Tgal
03 2.8114: Change rate schedules or other changes in utility service $10,570 - - - $10,570 - - - -
04 2.7111: Reduce illumination to minimum necessary levels $1,100 $138 $763
13,938
kWh
$275
-
kW-mo/yr
$62 - - - -
05 4.114: Add/modify equipment to improve drying process $98,120 $175,000 - - - $38,120
-
MMBtu
- $60,000 -
TOTAL RECOMMENDED $136,481 $175,738 $1,114
20,350
kWh
$519
-
kW-mo/yr
$10,667 $38,120
-
MMBtu
$25,650
-
Tgal
$60,000 $411
-
Tgal
TOTAL IMPLEMENTED $98,750 $175,250 $351
6,412
kWh
$244
-
kW-mo/yr
$35 $38,120
-
MMBtu
- $60,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs