ITAC Assessment: GT0713
ITAC logo
ITAC Assessment: GT0713
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Speakers
NAICS
n/a
SIC 3931: Musical Instruments
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 274,865
ft2
Annual Production 150,500
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,921 6,274,267
kWh
Electricity Demand $162,106 19,902
kW-mo/yr
Electricity Fees $24,661 -
Natural Gas $96,327 11,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 2.3137: Use power during off-peak periods $22,943 - - $22,943
-
kW-mo/yr
- - - -
02 2.3137: Use power during off-peak periods $2,767 - - - $2,767 - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,175 $200 $2,787
58,950
kWh
$2,098
-
kW-mo/yr
$290 - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,580 $3,750 $4,516
108,000
kWh
$4,524
-
kW-mo/yr
$540 - - -
05 2.3132: Recharge batteries on during off-peak demand periods $2,350 $840 - $2,215
-
kW-mo/yr
$135 - - -
06 3.5311: Recover and reuse waste material $77,243 $235,000 $(-3,279.0)
(-110,000)
kWh
$(-2,826.0)
-
kW-mo/yr
- $18,678
-
lb
- $64,670
07 3.5311: Recover and reuse waste material $8,000 $5,000 - - - $18,678
-
lb
$(-10,678.0) -
TOTAL RECOMMENDED $128,058 $244,790 $4,024
56,950
kWh
$28,954
-
kW-mo/yr
$3,732 $37,356
-
lb
$(-10,678.0) $64,670
TOTAL IMPLEMENTED $17,522 $3,950 $7,303
166,950
kWh
$6,622
-
kW-mo/yr
$3,597 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs