ITAC Assessment: GT0711
ITAC logo
ITAC Assessment: GT0711
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 50,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,749 604,800
kWh
Electricity Demand $19,634 1,823
kW-mo/yr
Electricity Fees $7,557 -
Natural Gas $3,061 319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $6,495 $2,000 - - $6,495 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,025 $3,725 $981
31,654
kWh
$910
-
kW-mo/yr
$134 - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $845 $1,450 $277
8,936
kWh
$514
-
kW-mo/yr
$54 - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $331 $310 $64
2,078
kWh
$30
-
kW-mo/yr
- - $27 $210
05 2.6241: Reduce temperature of process equipment when on standby $15 - $15
495
kWh
- - - - -
06 2.4314: Use synthetic lubricant $75 - $24
778
kWh
$46
-
kW-mo/yr
$5 - - -
07 2.2222: Convert liquid heaters from underfiring to immersion or submersion heating $140 $800 $140
4,463
kWh
- - - - -
08 2.7224: Reduce space conditioning during non-working hours $510 $225 $60
1,940
kWh
- - $450
-
MMBtu
- -
TOTAL RECOMMENDED $10,436 $8,510 $1,561
50,344
kWh
$1,500
-
kW-mo/yr
$6,688 $450
-
MMBtu
$27 $210
TOTAL IMPLEMENTED $860 $1,450 $292
9,431
kWh
$514
-
kW-mo/yr
$54 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs