Assessment Year | 2001 |
---|---|
Principal Product | Print Fabrics |
NAICS |
n/a
|
SIC | 2269: Finishers of Textiles, Not elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
100,000
ft2
|
Annual Production | 9,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,487 | 3,029,160 |
kWh
|
$0.051 |
Electricity Demand | $79,762 | 13,033 |
kW-mo/yr
|
$6.12 |
Electricity Fees | $19,175 | - |
|
- |
Natural Gas | $480,739 | 99,272 |
MMBtu
|
$4.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $208,329 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,562 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1211: Move boiler to more efficient location | $7,140 | - | - | - | - |
$7,140
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,765 | - | - | - | - |
$6,265
-
MMBtu
|
$(-1,500.0) | - | |
03 | 2.8112: Combine utility meters | $11,677 | $1,000 | - | - | $11,677 | - | - | - | |
04 | 2.1113: Reduce combustion air flow to optimum | $38,843 | $13,500 | - | - | - |
$38,843
-
MMBtu
|
- | - | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $132,090 | $60,000 | - | - | - |
$132,090
-
MMBtu
|
- | - | |
06 | 2.2113: Repair or replace steam traps | $9,164 | $10,500 | - | - | - |
$8,905
-
MMBtu
|
- |
$259
-
Tgal
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,650 | $21,400 |
$3,528
69,168
kWh
|
$813
-
kW-mo/yr
|
$309 | - | - | - | |
TOTAL RECOMMENDED | $208,329 | $106,400 |
$3,528
69,168
kWh
|
$813
-
kW-mo/yr
|
$11,986 |
$193,243
-
MMBtu
|
$(-1,500.0) |
$259
-
Tgal
|
||
TOTAL IMPLEMENTED | $64,562 | $45,400 |
$3,528
69,168
kWh
|
$813
-
kW-mo/yr
|
$309 |
$61,153
-
MMBtu
|
$(-1,500.0) |
$259
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs