ITAC Assessment: GT0692
ITAC logo
ITAC Assessment: GT0692
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Gears
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 40,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 8,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,260 4,945,194
kWh
Natural Gas $651 88
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7243: Improve air circulation with destratification fans / other methods $7,357 $2,000 $2,557
52,462
kWh
- - $4,800 - -
02 2.7241: Install outside air damper / economizer on hvac unit $7,810 $1,000 $7,810
330,305
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,690 $4,000 $6,690
204,865
kWh
- - - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $3,465 $500 - - $3,465
-
Tgal
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,500 $170,000 $44,500
1,199,590
kWh
- - - - $9,000
06 2.3192: Use fossil fuel powered generator during peak demand periods $9,831 $26,400 $14,927
54,220
kWh
$(-5,096.0)
-
MMBtu
- - - -
07 2.7232: Replace existing hvac unit with high efficiency model $19,321 $41,750 $19,321
429,953
kWh
- - - - -
08 2.8114: Change rate schedules or other changes in utility service $5,155 - - - - - $5,155 -
TOTAL RECOMMENDED $113,129 $245,650 $95,805
2,271,395
kWh
$(-5,096.0)
-
MMBtu
$3,465
-
Tgal
$4,800 $5,155 $9,000
TOTAL IMPLEMENTED $21,857 $7,000 $17,057
587,632
kWh
- - $4,800 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs