| Assessment Year | 2000 |
|---|---|
| Principal Product | Plastic Gears |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
40,000
ft2
|
| Annual Production | 5,000,000
lb
|
| Production Hrs. Annual | 8,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $184,260 | 4,945,194 |
kWh
|
$0.037 |
| Natural Gas | $651 | 88 |
MMBtu
|
$7.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $113,129 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,857 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $7,357 | $2,000 |
$2,557
52,462
kWh
|
- | - | $4,800 | - | - | |
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $7,810 | $1,000 |
$7,810
330,305
kWh
|
- | - | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,690 | $4,000 |
$6,690
204,865
kWh
|
- | - | - | - | - | |
| 04 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,465 | $500 | - | - |
$3,465
-
Tgal
|
- | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $53,500 | $170,000 |
$44,500
1,199,590
kWh
|
- | - | - | - | $9,000 | |
| 06 | 2.3192: Use fossil fuel powered generator during peak demand periods | $9,831 | $26,400 |
$14,927
54,220
kWh
|
$(-5,096.0)
-
MMBtu
|
- | - | - | - | |
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $19,321 | $41,750 |
$19,321
429,953
kWh
|
- | - | - | - | - | |
| 08 | 2.8114: Change rate schedules or other changes in utility service | $5,155 | - | - | - | - | - | $5,155 | - | |
| TOTAL RECOMMENDED | $113,129 | $245,650 |
$95,805
2,271,395
kWh
|
$(-5,096.0)
-
MMBtu
|
$3,465
-
Tgal
|
$4,800 | $5,155 | $9,000 | ||
| TOTAL IMPLEMENTED | $21,857 | $7,000 |
$17,057
587,632
kWh
|
- | - | $4,800 | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs