| Assessment Year | 2000 |
|---|---|
| Principal Product | Industrial Control Boards |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 450 |
| Plant Area |
193,550
ft2
|
| Annual Production | 1,496,820
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $381,577 | 9,885,405 |
kWh
|
$0.039 |
| Electricity Demand | $85,366 | 18,319 |
kW-mo/yr
|
$4.66 |
| Electricity Fees | $24,406 | - |
|
- |
| Natural Gas | $5,429 | 878 |
MMBtu
|
$6.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,411 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,746 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $4,444 | $2,240 |
$4,192
89,390
kWh
|
- | $252 | - | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,360 | $15,907 |
$6,774
182,884
kWh
|
$2,057
-
kW-mo/yr
|
$529 | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,190 | $12,285 |
$3,953
84,115
kWh
|
- | $237 | - | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,760 | $1,050 |
$4,415
114,302
kWh
|
$1,019
-
kW-mo/yr
|
$326 | - | - | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $280 | $800 |
$264
7,034
kWh
|
- | $16 | - | - | - | - | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $17,022 | $53,400 |
$9,495
245,897
kWh
|
$6,563
-
kW-mo/yr
|
$964 | - | - | - | - | |
| 07 | 2.1231: Establish burner maintenance schedule for boilers | $1,920 | $450 | - | - | - |
$1,920
-
MMBtu
|
- | - | - | |
| 08 | 4.611: Begin a practice of predictive / preventative maintenance | $4,435 | $4,950 |
$1,452
37,515
kWh
|
- | - | - | $(-23,050.0) | $964 | $25,069 | |
| TOTAL RECOMMENDED | $47,411 | $91,082 |
$30,545
761,137
kWh
|
$9,639
-
kW-mo/yr
|
$2,324 |
$1,920
-
MMBtu
|
$(-23,050.0) | $964 | $25,069 | ||
| TOTAL IMPLEMENTED | $21,746 | $56,440 |
$13,951
342,321
kWh
|
$6,563
-
kW-mo/yr
|
$1,232 | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs