ITAC Assessment: GT0688
ITAC logo
ITAC Assessment: GT0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Industrial Control Boards
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 193,550
ft2
Annual Production 1,496,820
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $381,577 9,885,405
kWh
Electricity Demand $85,366 18,319
kW-mo/yr
Electricity Fees $24,406 -
Natural Gas $5,429 878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $4,444 $2,240 $4,192
89,390
kWh
- $252 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,360 $15,907 $6,774
182,884
kWh
$2,057
-
kW-mo/yr
$529 - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,190 $12,285 $3,953
84,115
kWh
- $237 - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,760 $1,050 $4,415
114,302
kWh
$1,019
-
kW-mo/yr
$326 - - - -
05 2.4221: Install compressor air intakes in coolest locations $280 $800 $264
7,034
kWh
- $16 - - - -
06 2.7232: Replace existing hvac unit with high efficiency model $17,022 $53,400 $9,495
245,897
kWh
$6,563
-
kW-mo/yr
$964 - - - -
07 2.1231: Establish burner maintenance schedule for boilers $1,920 $450 - - - $1,920
-
MMBtu
- - -
08 4.611: Begin a practice of predictive / preventative maintenance $4,435 $4,950 $1,452
37,515
kWh
- - - $(-23,050.0) $964 $25,069
TOTAL RECOMMENDED $47,411 $91,082 $30,545
761,137
kWh
$9,639
-
kW-mo/yr
$2,324 $1,920
-
MMBtu
$(-23,050.0) $964 $25,069
TOTAL IMPLEMENTED $21,746 $56,440 $13,951
342,321
kWh
$6,563
-
kW-mo/yr
$1,232 - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs