ITAC Assessment: GT0687
ITAC logo
ITAC Assessment: GT0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Automobile Assembly
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 165,500
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,099 1,238,277
kWh
Electricity Fees $6,903 -
Natural Gas $25,576 3,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $152,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.8112: Combine utility meters $83,824 - - - - - - $83,824 - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $33,596 - - $1,902 - - - $31,694 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $608 $950 $574
6,155
kWh
$34 - - - - - -
04 2.7111: Reduce illumination to minimum necessary levels $1,030 $1,350 $972
10,551
kWh
$58 - - - - - -
05 3.5316: Contract a wood pallet recycling company $5,787 - - - - $2,187
-
lb
- - $3,600 -
06 4.114: Add/modify equipment to improve drying process $25,338 $43,000 $(-1,597.0)
(-16,413)
kWh
- $13,131
-
MMBtu
- $13,804 - - -
07 3.4111: Use closed cycle process to minimize waste water production $991 $742 - - - - - - - $991
-
Tgal
08 4.211: Consider use / purchase of bulk materials where possible $1,045 $700 - - - $1,045
-
lb
- - - -
09 2.7231: Use radiant heater for spot heating $374 $150 - - $374
-
MMBtu
- - - - -
TOTAL RECOMMENDED $152,593 $46,892 $(-51.0)
293
kWh
$1,994 $13,505
-
MMBtu
$3,232
-
lb
$13,804 $115,518 $3,600 $991
-
Tgal
TOTAL IMPLEMENTED $91,210 $1,692 $574
6,155
kWh
$34 - $2,187
-
lb
- $83,824 $3,600 $991
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs