ITAC Assessment: GT0679
ITAC logo
ITAC Assessment: GT0679
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Acrylic,Latex,& Coatings
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 45,000
ft2
Annual Production 542
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,241 1,806,858
kWh
Electricity Demand $21,406 5,409
kW-mo/yr
Electricity Fees $7,183 -
Natural Gas $87,374 17,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.8112: Combine utility meters $1,400 - - - - - - $1,400 -
02 2.1333: Convert combustion equipment to burn oil $27,261 $5,000 - - $79,206
-
MMBtu
$(-51,945.0)
-
MMBtu
- - -
03 2.2135: Repair and eliminate steam leaks $1,157 $200 - - - $1,130
-
MMBtu
- - $27
-
Tgal
04 2.2123: Insulate feedwater tank $4,877 $5,350 - - - $4,877
-
MMBtu
- - -
05 2.2153: Close off unneeded steam lines $164 $50 - - - $164
-
MMBtu
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,006 $46,917 $4,436
184,642
kWh
$2,570
-
kW-mo/yr
- - - - -
07 4.652: Replace existing equipment with more suitable substitutes $5,625 $14,270 - - - - $5,625 - -
TOTAL RECOMMENDED $47,490 $71,787 $4,436
184,642
kWh
$2,570
-
kW-mo/yr
$79,206
-
MMBtu
$(-45,774.0)
-
MMBtu
$5,625 $1,400 $27
-
Tgal
TOTAL IMPLEMENTED $6,198 $5,600 - - - $6,171
-
MMBtu
- - $27
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs