Assessment Year | 1999 |
---|---|
Principal Product | Acrylic,Latex,& Coatings |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $1 M to 5M |
# of Employees | 11 |
Plant Area |
45,000
ft2
|
Annual Production | 542
Tgal
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,241 | 1,806,858 |
kWh
|
$0.024 |
Electricity Demand | $21,406 | 5,409 |
kW-mo/yr
|
$3.96 |
Electricity Fees | $7,183 | - |
|
- |
Natural Gas | $87,374 | 17,364 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $1,400 | - | - | - | - | - | - | $1,400 | - | |
02 | 2.1333: Convert combustion equipment to burn oil | $27,261 | $5,000 | - | - |
$79,206
-
MMBtu
|
$(-51,945.0)
-
MMBtu
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $1,157 | $200 | - | - | - |
$1,130
-
MMBtu
|
- | - |
$27
-
Tgal
|
|
04 | 2.2123: Insulate feedwater tank | $4,877 | $5,350 | - | - | - |
$4,877
-
MMBtu
|
- | - | - | |
05 | 2.2153: Close off unneeded steam lines | $164 | $50 | - | - | - |
$164
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,006 | $46,917 |
$4,436
184,642
kWh
|
$2,570
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $5,625 | $14,270 | - | - | - | - | $5,625 | - | - | |
TOTAL RECOMMENDED | $47,490 | $71,787 |
$4,436
184,642
kWh
|
$2,570
-
kW-mo/yr
|
$79,206
-
MMBtu
|
$(-45,774.0)
-
MMBtu
|
$5,625 | $1,400 |
$27
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,198 | $5,600 | - | - | - |
$6,171
-
MMBtu
|
- | - |
$27
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs