ITAC Assessment: GT0664
ITAC logo
ITAC Assessment: GT0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Custom Mixed Rubber
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 153,000
ft2
Annual Production 86,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,272 11,511,430
kWh
Electricity Fees $41,790 -
Natural Gas $61,415 10,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $31,943 - - $24,060
-
kW-mo/yr
$7,883 - - -
02 2.2511: Insulate bare equipment $13,210 $19,500 - - - $13,210
-
MMBtu
- -
03 3.4155: Meter waste water $408 $450 - - - - $408
-
Tgal
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,465 $1,280 $2,325
41,032
kWh
- $140 - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,487 $890 $1,403
24,912
kWh
- $84 - - -
06 2.4322: Use or replace with energy efficient substitutes $1,985 $660 $1,873
33,118
kWh
- $112 - - -
07 2.7235: Install fossil fuel make-up air unit $2,110 $5,500 - - - $2,110
-
MMBtu
- -
08 2.7132: Install timers on light switches in little used areas $29,350 $5,500 $27,689
489,449
kWh
- $1,661 - - -
09 3.4151: Minimize water usage $3,000 $10,100 - - - - - $3,000
-
Tgal
TOTAL RECOMMENDED $85,958 $43,880 $33,290
588,511
kWh
$24,060
-
kW-mo/yr
$9,880 $15,320
-
MMBtu
$408
-
Tgal
$3,000
-
Tgal
TOTAL IMPLEMENTED $15,195 $20,160 $1,873
33,118
kWh
- $112 $13,210
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs