ITAC Assessment: GT0661
ITAC logo
ITAC Assessment: GT0661
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fluorescent Lighting
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 356,800
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,438 4,130,715
kWh
Natural Gas $39,080 4,480
MMBtu
LPG $16,777 2,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $918,264 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $891,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $20,275 $4,960 $20,275
316,530
kWh
- - - - -
02 2.7132: Install timers on light switches in little used areas $1,938 $300 $1,938
30,188
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,740 $750 $5,740
89,683
kWh
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $457 $994 $457
7,034
kWh
- - - - -
05 3.5111: Filter and reuse hydraulic oil $684 $1,000 - $187
-
lb
- - $497 -
06 3.1192: Reduce scrap production $215,560 $112,500 - - $(-11,000.0) $226,560 - -
07 4.652: Replace existing equipment with more suitable substitutes $673,610 $245,000 - - - $23,610 - $650,000
TOTAL RECOMMENDED $918,264 $365,504 $28,410
443,435
kWh
$187
-
lb
$(-11,000.0) $250,170 $497 $650,000
TOTAL IMPLEMENTED $891,108 $357,800 $1,938
30,188
kWh
- $(-11,000.0) $250,170 - $650,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs