Assessment Year | 1998 |
---|---|
Principal Product | Fertilizer Spreaders |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
150,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,191 | 192,556 |
kWh
|
$0.11 |
Electricity Fees | $2,457 | - |
|
- |
Natural Gas | $8,633 | 1,305 |
MMBtu
|
$6.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,007 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,734 | $12,757 |
$3,734
33,705
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $150 | $52 |
$150
1,465
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170 | $108 |
$170
1,465
kWh
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $737 | $150 |
$737
6,741
kWh
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $200 | - |
$200
1,758
kWh
|
- | - | - | |
06 | 2.8123: Pay utility bills on time | $1,330 | - | - | - | $1,330 | - | |
07 | 3.4151: Minimize water usage | $935 | $1,100 | - |
$927
-
MMBtu
|
- |
$8
-
Tgal
|
|
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $3,740 | $5,000 | - | - | $3,740 | - | |
TOTAL RECOMMENDED | $10,996 | $19,167 |
$4,991
45,134
kWh
|
$927
-
MMBtu
|
$5,070 |
$8
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,007 | $5,150 |
$937
8,499
kWh
|
- | $5,070 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs