ITAC Assessment: GT0651
ITAC logo
ITAC Assessment: GT0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product hand tools
NAICS
n/a
SIC 3421: Cutlery
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 250,000
ft2
Annual Production 5,800,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $605,580 18,924,385
kWh
Electricity Demand $276,145 24,959
kW-mo/yr
Electricity Fees $52,903 -
Natural Gas $112,056 24,259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,260 $3,100 $17,226
538,394
kWh
- $1,034 - - - -
02 2.2514: Cover open tanks $21,415 $6,174 $11,023
436,694
kWh
$9,179
-
kW-mo/yr
$1,213 - - - -
03 2.4133: Use most efficient type of electric motors $6,874 $52,766 $3,533
139,801
kWh
$2,952
-
kW-mo/yr
$389 - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,505 $3,933 $774
30,481
kWh
$646
-
kW-mo/yr
$85 - - - -
05 2.2136: Install / repair insulation on steam lines $1,004 $413 - - - $1,004
-
MMBtu
- - -
06 3.5311: Recover and reuse waste material $16,208 $38,860 - - - - $3,028
-
lb
$13,180 -
07 3.5316: Contract a wood pallet recycling company $2,099 - - - - - $699
-
lb
$1,400 -
08 4.111: Add equipment/ operators to reduce production bottleneck $105,300 $120,000 - - - - - - $105,300
TOTAL RECOMMENDED $172,665 $225,246 $32,556
1,145,370
kWh
$12,777
-
kW-mo/yr
$2,721 $1,004
-
MMBtu
$3,727
-
lb
$14,580 $105,300
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs