ITAC Assessment: GT0650
ITAC logo
ITAC Assessment: GT0650
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Spun Yarn / Filament
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 400,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $429,769 13,195,194
kWh
Electricity Demand $240,365 27,660
kW-mo/yr
Electricity Fees $50,616 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $25,720 - - - - - $(-6,050.0)
-
MMBtu
$31,770 -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,647 - - - - $6,647
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,648 - $4,082
125,440
kWh
$2,190
-
kW-mo/yr
$376 - - - -
04 3.4111: Use closed cycle process to minimize waste water production $698 $800 - - - $685
-
MMBtu
- - $13
-
Tgal
05 2.4239: Eliminate or reduce compressed air usage $52,300 $25,000 $15,243
468,054
kWh
$8,134
-
kW-mo/yr
$1,423 - - $27,500 -
06 2.4133: Use most efficient type of electric motors $5,022 $3,100 $3,090
94,959
kWh
$1,668
-
kW-mo/yr
$264 - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,493 $66,930 $8,766
272,567
kWh
$4,693
-
kW-mo/yr
$1,034 - - - -
TOTAL RECOMMENDED $111,528 $95,830 $31,181
961,020
kWh
$16,685
-
kW-mo/yr
$3,097 $7,332
-
MMBtu
$(-6,050.0)
-
MMBtu
$59,270 $13
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs