Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Stamped Metal Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 30,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,486 699,590
kWh
Electricity Demand $23,391 2,034
kW-mo/yr
Electricity Fees $8,339 -
Natural Gas $2,325 315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,309 $3,080 $694
19,930
kWh
$615
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $2,200 $445
12,603
kWh
$200
-
kW-mo/yr
- - -
03 2.7245: Use direct air supply to exhaust hoods $860 $4,625 - - $860
-
MMBtu
- -
04 2.7243: Improve air circulation with destratification fans / other methods $430 $1,992 - - $430
-
MMBtu
- -
05 4.441: Install automatic packing equipment $2,260 $3,125 - - - $770
-
lb
$1,490
TOTAL RECOMMENDED $5,504 $15,022 $1,139
32,533
kWh
$815
-
kW-mo/yr
$1,290
-
MMBtu
$770
-
lb
$1,490
TOTAL IMPLEMENTED $1,954 $5,280 $1,139
32,533
kWh
$815
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs