ITAC Assessment: GT0644
ITAC logo
ITAC Assessment: GT0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Scrap Processing Equipment
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 150,000
ft2
Annual Production 9,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,327 6,134,525
kWh
Electricity Demand $152,685 18,785
kW-mo/yr
Electricity Fees $54,288 -
Natural Gas $129,861 17,379
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $303 - $153
7,034
kWh
$136
-
kW-mo/yr
$14 - -
02 2.2514: Cover open tanks $6,346 $1,838 $2,869
131,594
kWh
$3,062
-
kW-mo/yr
$415 - -
03 2.6218: Turn off equipment when not in use $6,251 - $2,668
122,509
kWh
$3,165
-
kW-mo/yr
$418 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,049 $5,558 $692
31,653
kWh
$1,182
-
kW-mo/yr
$175 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,160 $750 $1,594
72,978
kWh
$1,359
-
kW-mo/yr
$207 - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $12,300 $2,000 - - - - $12,300
07 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $21,400 $32,860 - - - - $21,400
08 3.5111: Filter and reuse hydraulic oil $7,448 $4,500 - - - - $7,448
09 4.512: Condense operation into one building $6,516 - - - - $6,516 -
TOTAL RECOMMENDED $65,773 $47,506 $7,976
365,768
kWh
$8,904
-
kW-mo/yr
$1,229 $6,516 $41,148
TOTAL IMPLEMENTED $16,230 $750 $4,415
202,521
kWh
$4,660
-
kW-mo/yr
$639 $6,516 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs