ITAC Assessment: GT0642
ITAC logo
ITAC Assessment: GT0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Patterned Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 342,000
ft2
Annual Production 36,900,000
thousand feet
Production Hrs. Annual 7,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,362 8,913,247
kWh
Electricity Demand $118,454 24,678
kW-mo/yr
Electricity Fees $16,642 -
Natural Gas $316,073 62,678
MMBtu
LPG $19,934 1,879
MMBtu
Fuel Oil #2 $11,854 1,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings LPG Savings Administrative Changes Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $65,180 $100,000 - - $65,180 -
02 4.711: Initiate a total quality management program $8,990 - - - $8,990 -
03 2.8112: Combine utility meters $41,000 - - - $41,000 -
04 2.2113: Repair or replace steam traps $23,695 $13,000 $23,280
-
MMBtu
- - $415
-
Tgal
05 3.4111: Use closed cycle process to minimize waste water production $9,530 $12,500 $8,190
-
MMBtu
- - $1,340
-
Tgal
06 4.131: Modify process to reduce material use/cost $26,700 $40,500 $19,500
-
MMBtu
- $7,200 -
07 3.4111: Use closed cycle process to minimize waste water production $35,596 $52,700 $30,610
-
MMBtu
- $136 $4,850
-
Tgal
08 2.1332: Convert combustion equipment to burn natural gas $14,022 $27,000 $(-5,900.0)
-
MMBtu
$19,922
-
MMBtu
- -
TOTAL RECOMMENDED $224,713 $245,700 $75,680
-
MMBtu
$19,922
-
MMBtu
$122,506 $6,605
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Natural Gas Savings LPG Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs