Assessment Year | 1998 |
---|---|
Principal Product | Manufactured Housing |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
121,802
ft2
|
Annual Production | 3,030
pieces
|
Production Hrs. Annual | 2,020
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,819 | 1,011,430 |
kWh
|
$0.054 |
Electricity Demand | $30,841 | 4,021 |
kW-mo/yr
|
$7.67 |
Electricity Fees | $9,661 | - |
|
- |
Natural Gas | $17,124 | 2,379 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,924 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,834 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $60,000 | $60,000 | - | - | - |
$60,000
-
lb
|
|
02 | 2.4314: Use synthetic lubricant | $1,162 | - |
$661
12,309
kWh
|
$501
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,947 | $5,062 |
$1,503
29,601
kWh
|
$1,304
-
kW-mo/yr
|
$140 | - | |
04 | 3.1172: Revise raw material specs | $14,100 | - | - | - | - |
$14,100
-
lb
|
|
05 | 3.5311: Recover and reuse waste material | $2,640 | - | - | - | - |
$2,640
-
lb
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,932 | $2,700 |
$5,932
109,320
kWh
|
$4,479
-
kW-mo/yr
|
$521 | - | |
07 | 3.1162: Use less wasteful packaging | $143 | - | - | - | - |
$143
-
lb
|
|
TOTAL RECOMMENDED | $91,924 | $67,762 |
$8,096
151,230
kWh
|
$6,284
-
kW-mo/yr
|
$661 |
$76,883
-
lb
|
||
TOTAL IMPLEMENTED | $28,834 | $2,700 |
$6,593
121,629
kWh
|
$4,980
-
kW-mo/yr
|
$521 |
$16,740
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs