ITAC Assessment: GT0635
ITAC logo
ITAC Assessment: GT0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Auto Floor Mats
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 120,000
ft2
Annual Production 6,250,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,411 4,785,463
kWh
Electricity Demand $96,000 8,000
kW-mo/yr
Electricity Fees $14,725 -
Natural Gas $264,808 63,946
MMBtu
LPG $15,800 1,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $201,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $34,200 - - - - - $34,200 - -
02 2.1231: Establish burner maintenance schedule for boilers $27,100 $900 - $27,100
-
MMBtu
- - - - -
03 2.2135: Repair and eliminate steam leaks $4,400 $800 - $4,400
-
MMBtu
- - - - -
04 2.2136: Install / repair insulation on steam lines $3,580 $2,990 - $3,580
-
MMBtu
- - - - -
05 2.2113: Repair or replace steam traps $45,520 $40,100 - $43,700
-
MMBtu
- - - - $1,820
-
Tgal
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $200 $940
33,118
kWh
- - - - - -
07 2.8227: Adjust / maintain fork lift trucks for most efficient operation $9,160 $18,600 - - $9,160
-
MMBtu
- - - -
08 4.211: Consider use / purchase of bulk materials where possible $52,700 $127,000 - - - $9,580 - $43,120 -
09 3.4154: Eliminate leaks in water lines and valves $24,000 $8,000 - - - - - - $24,000
-
Tgal
TOTAL RECOMMENDED $201,600 $198,590 $940
33,118
kWh
$78,780
-
MMBtu
$9,160
-
MMBtu
$9,580 $34,200 $43,120 $25,820
-
Tgal
TOTAL IMPLEMENTED $112,160 $42,000 $940
33,118
kWh
$75,200
-
MMBtu
- - $34,200 - $1,820
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs