ITAC Assessment: GT0628
ITAC logo
ITAC Assessment: GT0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Copper-Clad Laminates
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $100
M
to 500
M
# of Employees 475
Plant Area 243,000
ft2
Annual Production 72,500
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,010 25,830,598
kWh
Electricity Demand $367,000 40,330
kW-mo/yr
Electricity Fees $19,175 -
Natural Gas $1,616,015 468,867
MMBtu
LPG $48,660 6,808
MMBtu
Fuel Oil #2 $128,548 13,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $351,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $86,500 $120,000 n/a - $51,200
-
kW-mo/yr
$35,300 - - - - -
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $186,200 $245,000 n/a $193,330
5,019,050
kWh
$35,670
-
kW-mo/yr
- $(-12,800.0)
-
MMBtu
- $(-30,000.0) - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,903 $37,960 n/a $7,852
341,442
kWh
$4,051
-
kW-mo/yr
- - - - - -
04 2.2437: Recover waste heat from equipment $4,263 $5,550 n/a $540
19,050
kWh
- - $3,723
-
MMBtu
- - - -
05 3.4151: Minimize water usage $2,924 - n/a - - - $2,203
-
MMBtu
$452
-
Tgal
- - $269
-
Tgal
06 3.4141: Replace the chlorination stage with an oxygen or ozone stage $23,066 $72,100 n/a $6,609
133,060
kWh
- - - $4,592
-
Tgal
- $9,130 $2,735
-
Tgal
07 4.652: Replace existing equipment with more suitable substitutes $37,000 - n/a - - - - - - $37,000 -
TOTAL RECOMMENDED $351,856 $480,610 $208,331
5,512,602
kWh
$90,921
-
kW-mo/yr
$35,300 $(-6,874.0)
-
MMBtu
$5,044
-
Tgal
$(-30,000.0) $46,130 $3,004
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs