ITAC Assessment: GT0627
ITAC logo
ITAC Assessment: GT0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Chicken Broth
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 70,000
ft2
Annual Production 48,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,201 7,741,794
kWh
Electricity Demand $149,851 17,506
kW-mo/yr
Electricity Fees $9,078 -
Natural Gas $450,444 126,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,501 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.8113: Purchase gas directly from a contract gas supplier $26,200 $173,400 - - $(-37,150.0)
-
MMBtu
$63,350 - -
02 2.8112: Combine utility meters $3,680 $1,830 - - - $3,680 - -
03 2.3212: Optimize plant power factor $22,150 $24,500 - $22,150
-
kW-mo/yr
- - - -
04 2.7132: Install timers on light switches in little used areas $2,488 $400 $1,183
47,186
kWh
$1,305
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $9,290 $13,500 - - $9,290
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $1,303 $1,665 - - $1,303
-
MMBtu
- - -
07 2.2121: Increase amount of condensate returned $14,110 $850 - - $11,440
-
MMBtu
- $2,670 -
08 2.4133: Use most efficient type of electric motors $7,850 $49,700 $4,820
191,383
kWh
$3,030
-
kW-mo/yr
- - - -
09 3.7141: Improve cleaning efficiency by maintaining cleaning system $40,430 $4,200 $1,450
58,030
kWh
$980
-
kW-mo/yr
- - - $38,000
TOTAL RECOMMENDED $127,501 $270,045 $7,453
296,599
kWh
$27,465
-
kW-mo/yr
$(-15,117.0)
-
MMBtu
$67,030 $2,670 $38,000
TOTAL IMPLEMENTED $114,531 $254,715 $7,453
296,599
kWh
$27,465
-
kW-mo/yr
$(-24,407.0)
-
MMBtu
$63,350 $2,670 $38,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs