ITAC Assessment: GT0601
ITAC logo
ITAC Assessment: GT0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Marble Tubs and Countertops
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 27,500
ft2
Annual Production 2,700,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,452 408,265
kWh
Electricity Demand $18,194 1,231
kW-mo/yr
Electricity Fees $5,021 -
Natural Gas $7,130 1,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,892 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,440 $12,710 $2,080
81,184
kWh
$4,231
-
kW-mo/yr
$129 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,643 $350 $1,355
53,048
kWh
$2,115
-
kW-mo/yr
$173 - -
03 2.4239: Eliminate or reduce compressed air usage $1,579 $2,000 $353
13,775
kWh
$1,151
-
kW-mo/yr
$75 - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $45,800 $10,000 - - - - $45,800
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,830 $6,000 - - - $3,830
-
MMBtu
-
06 3.1162: Use less wasteful packaging $21,600 $45,000 - - - - $21,600
TOTAL RECOMMENDED $82,892 $76,060 $3,788
148,007
kWh
$7,497
-
kW-mo/yr
$377 $3,830
-
MMBtu
$67,400
TOTAL IMPLEMENTED $35,513 $64,060 $3,435
134,232
kWh
$6,346
-
kW-mo/yr
$302 $3,830
-
MMBtu
$21,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs