Assessment Year | 1996 |
---|---|
Principal Product | Marble Tubs and Countertops |
NAICS |
n/a
|
SIC | 3281: Cut Stone and Stone Products |
Sales Range | $1 M to 5M |
# of Employees | 62 |
Plant Area |
27,500
ft2
|
Annual Production | 2,700,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $10,452 | 408,265 |
kWh
|
$0.026 |
Electricity Demand | $18,194 | 1,231 |
kW-mo/yr
|
$14.78 |
Electricity Fees | $5,021 | - |
|
- |
Natural Gas | $7,130 | 1,096 |
MMBtu
|
$6.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,892 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,513 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,440 | $12,710 |
$2,080
81,184
kWh
|
$4,231
-
kW-mo/yr
|
$129 | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,643 | $350 |
$1,355
53,048
kWh
|
$2,115
-
kW-mo/yr
|
$173 | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,579 | $2,000 |
$353
13,775
kWh
|
$1,151
-
kW-mo/yr
|
$75 | - | - | |
04 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $45,800 | $10,000 | - | - | - | - | $45,800 | |
05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $3,830 | $6,000 | - | - | - |
$3,830
-
MMBtu
|
- | |
06 | 3.1162: Use less wasteful packaging | $21,600 | $45,000 | - | - | - | - | $21,600 | |
TOTAL RECOMMENDED | $82,892 | $76,060 |
$3,788
148,007
kWh
|
$7,497
-
kW-mo/yr
|
$377 |
$3,830
-
MMBtu
|
$67,400 | ||
TOTAL IMPLEMENTED | $35,513 | $64,060 |
$3,435
134,232
kWh
|
$6,346
-
kW-mo/yr
|
$302 |
$3,830
-
MMBtu
|
$21,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs