Assessment Year | 1996 |
---|---|
Principal Product | Carpet |
NAICS |
n/a
|
SIC | 2273: Carpets and Rugs |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
240,000
ft2
|
Annual Production | 387,000,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,942 | 15,590,856 |
kWh
|
$0.031 |
Natural Gas | $377,914 | 73,327 |
MMBtu
|
$5.15 |
Fuel Oil #6 | $857,493 | 314,720 |
MMBtu
|
$2.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $393,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,587 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,587 | $17,013 |
$1,587
50,996
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,611 | $25,662 |
$4,611
147,714
kWh
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,220 | $8,520 |
$5,220
167,351
kWh
|
- | - | - | |
04 | 2.1123: Install automatic stack damper | $48,900 | $75,450 | - |
$48,900
-
MMBtu
|
- | - | |
05 | 2.7134: Use photocell controls | $163 | $109 |
$163
5,275
kWh
|
- | - | - | |
06 | 2.2163: Use minimum steam operating pressure | $124,000 | $27,000 | - |
$124,000
-
MMBtu
|
- | - | |
07 | 2.8113: Purchase gas directly from a contract gas supplier | $152,800 | $102,000 | - | - | - | $152,800 | |
08 | 3.4151: Minimize water usage | $56,000 | $18,000 | - |
$28,000
-
MMBtu
|
$28,000
-
Tgal
|
- | |
TOTAL RECOMMENDED | $393,281 | $273,754 |
$11,581
371,336
kWh
|
$200,900
-
MMBtu
|
$28,000
-
Tgal
|
$152,800 | ||
TOTAL IMPLEMENTED | $1,587 | $17,013 |
$1,587
50,996
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs