ITAC Assessment: GT0595
ITAC logo
ITAC Assessment: GT0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 387,000,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,942 15,590,856
kWh
Natural Gas $377,914 73,327
MMBtu
Fuel Oil #6 $857,493 314,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $393,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,587 $17,013 $1,587
50,996
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,611 $25,662 $4,611
147,714
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,220 $8,520 $5,220
167,351
kWh
- - -
04 2.1123: Install automatic stack damper $48,900 $75,450 - $48,900
-
MMBtu
- -
05 2.7134: Use photocell controls $163 $109 $163
5,275
kWh
- - -
06 2.2163: Use minimum steam operating pressure $124,000 $27,000 - $124,000
-
MMBtu
- -
07 2.8113: Purchase gas directly from a contract gas supplier $152,800 $102,000 - - - $152,800
08 3.4151: Minimize water usage $56,000 $18,000 - $28,000
-
MMBtu
$28,000
-
Tgal
-
TOTAL RECOMMENDED $393,281 $273,754 $11,581
371,336
kWh
$200,900
-
MMBtu
$28,000
-
Tgal
$152,800
TOTAL IMPLEMENTED $1,587 $17,013 $1,587
50,996
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs