ITAC Assessment: GT0593
ITAC logo
ITAC Assessment: GT0593
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Nylon Yarn
NAICS
n/a
SIC 2281: Yarn Spinning Mills
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area 318,740
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,277,028 50,475,382
kWh
Electricity Demand $947,485 88,799
kW-mo/yr
Electricity Fees $153,106 -
Natural Gas $432,627 124,622
MMBtu
Fuel Oil #2 $78,545 18,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $26,920 $147,550 $16,640
657,679
kWh
$10,030
-
kW-mo/yr
$250 -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,303 $11,440 $8,297
327,960
kWh
$5,006
-
kW-mo/yr
- -
03 2.4314: Use synthetic lubricant $1,900 - $1,186
46,893
kWh
$674
-
kW-mo/yr
$40 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,670 $1,000 $3,540
140,094
kWh
$2,130
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,300 $55,000 $28,300
1,119,285
kWh
- - -
06 3.4155: Meter waste water $3,630 - - - - $3,630
-
Tgal
TOTAL RECOMMENDED $79,723 $214,990 $57,963
2,291,911
kWh
$17,840
-
kW-mo/yr
$290 $3,630
-
Tgal
TOTAL IMPLEMENTED $38,120 $148,550 $21,366
844,666
kWh
$12,834
-
kW-mo/yr
$290 $3,630
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs