ITAC Assessment: GT0590
ITAC logo
ITAC Assessment: GT0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Specialty Chemicals
NAICS
n/a
SIC 2861: Gum and Wood Chemicals
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 500,000
ft2
Annual Production 24,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,379 12,052,755
kWh
Electricity Demand $187,190 21,868
kW-mo/yr
Electricity Fees $35,621 -
Natural Gas $543,435 151,909
MMBtu
Other Energy $1,045,416 384,345
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $216,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $147,111

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $19,170 $116,000 $12,575
420,574
kWh
$5,506
-
kW-mo/yr
$1,089 - - - -
02 2.2135: Repair and eliminate steam leaks $30,732 $2,000 - - - $29,100
-
MMBtu
- $1,224
-
Tgal
$408
-
Tgal
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,040 $8,800 $7,265
242,966
kWh
$3,154
-
kW-mo/yr
$621 - - - -
04 2.1133: Adjust burners for efficient operation $40,100 $30,000 - - - $40,100
-
MMBtu
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $38,880 $60,000 - - - $38,880
-
MMBtu
- - -
06 2.1241: Reduce excessive boiler blowdown $18,987 $400 - - - - $17,700
-
MMBtu
$965
-
Tgal
$322
-
Tgal
07 2.7134: Use photocell controls $680 $218 $360
12,016
kWh
$291
-
kW-mo/yr
$29 - - - -
08 3.4154: Eliminate leaks in water lines and valves $22,680 $2,500 - - - - $2,520
-
MMBtu
$15,120
-
Tgal
$5,040
-
Tgal
09 2.2121: Increase amount of condensate returned $34,612 $31,200 - - - - $21,800
-
MMBtu
$9,609
-
Tgal
$3,203
-
Tgal
TOTAL RECOMMENDED $216,881 $251,118 $20,200
675,556
kWh
$8,951
-
kW-mo/yr
$1,739 $108,080
-
MMBtu
$42,020
-
MMBtu
$26,918
-
Tgal
$8,973
-
Tgal
TOTAL IMPLEMENTED $147,111 $66,100 - - - $69,200
-
MMBtu
$42,020
-
MMBtu
$26,918
-
Tgal
$8,973
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs