Assessment Year | 1996 |
---|---|
Principal Product | Specialty Chemicals |
NAICS |
n/a
|
SIC | 2861: Gum and Wood Chemicals |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
500,000
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,379 | 12,052,755 |
kWh
|
$0.030 |
Electricity Demand | $187,190 | 21,868 |
kW-mo/yr
|
$8.56 |
Electricity Fees | $35,621 | - |
|
- |
Natural Gas | $543,435 | 151,909 |
MMBtu
|
$3.58 |
Other Energy | $1,045,416 | 384,345 |
MMBtu
|
$2.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $216,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $147,111 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $19,170 | $116,000 |
$12,575
420,574
kWh
|
$5,506
-
kW-mo/yr
|
$1,089 | - | - | - | - | |
02 | 2.2135: Repair and eliminate steam leaks | $30,732 | $2,000 | - | - | - |
$29,100
-
MMBtu
|
- |
$1,224
-
Tgal
|
$408
-
Tgal
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,040 | $8,800 |
$7,265
242,966
kWh
|
$3,154
-
kW-mo/yr
|
$621 | - | - | - | - | |
04 | 2.1133: Adjust burners for efficient operation | $40,100 | $30,000 | - | - | - |
$40,100
-
MMBtu
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $38,880 | $60,000 | - | - | - |
$38,880
-
MMBtu
|
- | - | - | |
06 | 2.1241: Reduce excessive boiler blowdown | $18,987 | $400 | - | - | - | - |
$17,700
-
MMBtu
|
$965
-
Tgal
|
$322
-
Tgal
|
|
07 | 2.7134: Use photocell controls | $680 | $218 |
$360
12,016
kWh
|
$291
-
kW-mo/yr
|
$29 | - | - | - | - | |
08 | 3.4154: Eliminate leaks in water lines and valves | $22,680 | $2,500 | - | - | - | - |
$2,520
-
MMBtu
|
$15,120
-
Tgal
|
$5,040
-
Tgal
|
|
09 | 2.2121: Increase amount of condensate returned | $34,612 | $31,200 | - | - | - | - |
$21,800
-
MMBtu
|
$9,609
-
Tgal
|
$3,203
-
Tgal
|
|
TOTAL RECOMMENDED | $216,881 | $251,118 |
$20,200
675,556
kWh
|
$8,951
-
kW-mo/yr
|
$1,739 |
$108,080
-
MMBtu
|
$42,020
-
MMBtu
|
$26,918
-
Tgal
|
$8,973
-
Tgal
|
||
TOTAL IMPLEMENTED | $147,111 | $66,100 | - | - | - |
$69,200
-
MMBtu
|
$42,020
-
MMBtu
|
$26,918
-
Tgal
|
$8,973
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs