ITAC Assessment: GT0580
ITAC logo
ITAC Assessment: GT0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pressure Sensitive Labels
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 31,800
ft2
Annual Production 833
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,418 746,190
kWh
Electricity Demand $36,671 2,389
kW-mo/yr
Electricity Fees $422 -
Natural Gas $4,646 833
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.8114: Change rate schedules or other changes in utility service $1,982 - - $1,982
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $138 $1,240 $44
1,758
kWh
$94
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,110 $13,490 $2,162
85,580
kWh
$2,948
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,630 $400 $1,684
66,530
kWh
$1,946
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $220 - $100
4,103
kWh
$120
-
kW-mo/yr
-
06 3.1191: Change procedures / equipment / operating conditions $3,160 $21,465 $(-80.0)
(-3,224)
kWh
$(-230.0)
-
kW-mo/yr
$3,470
-
lb
TOTAL RECOMMENDED $14,240 $36,595 $3,910
154,747
kWh
$6,860
-
kW-mo/yr
$3,470
-
lb
TOTAL IMPLEMENTED $7,010 $21,865 $1,704
67,409
kWh
$1,836
-
kW-mo/yr
$3,470
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs