Assessment Year | 1996 |
---|---|
Principal Product | Pressure Sensitive Labels |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
31,800
ft2
|
Annual Production | 833
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,418 | 746,190 |
kWh
|
$0.030 |
Electricity Demand | $36,671 | 2,389 |
kW-mo/yr
|
$15.35 |
Electricity Fees | $422 | - |
|
- |
Natural Gas | $4,646 | 833 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $1,982 | - | - |
$1,982
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $138 | $1,240 |
$44
1,758
kWh
|
$94
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,110 | $13,490 |
$2,162
85,580
kWh
|
$2,948
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,630 | $400 |
$1,684
66,530
kWh
|
$1,946
-
kW-mo/yr
|
- | |
05 | 2.4314: Use synthetic lubricant | $220 | - |
$100
4,103
kWh
|
$120
-
kW-mo/yr
|
- | |
06 | 3.1191: Change procedures / equipment / operating conditions | $3,160 | $21,465 |
$(-80.0)
(-3,224)
kWh
|
$(-230.0)
-
kW-mo/yr
|
$3,470
-
lb
|
|
TOTAL RECOMMENDED | $14,240 | $36,595 |
$3,910
154,747
kWh
|
$6,860
-
kW-mo/yr
|
$3,470
-
lb
|
||
TOTAL IMPLEMENTED | $7,010 | $21,865 |
$1,704
67,409
kWh
|
$1,836
-
kW-mo/yr
|
$3,470
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs