ITAC Assessment: GT0579
ITAC logo
ITAC Assessment: GT0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Latex Caulking
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 120,000
ft2
Annual Production 17,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,065 1,990,914
kWh
Electricity Demand $79,016 5,185
kW-mo/yr
Electricity Fees $6,496 -
Natural Gas $17,308 6,349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $784 $3,892 $298
11,430
kWh
$486
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $681 $550 $201
7,913
kWh
$480
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $844 $200 $481
18,464
kWh
$363
-
kW-mo/yr
- - -
04 2.7111: Reduce illumination to minimum necessary levels $3,141 $230 $1,097
42,204
kWh
$2,044
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $835 $1,260 $111
4,689
kWh
$724
-
kW-mo/yr
- - -
06 2.7231: Use radiant heater for spot heating $1,940 $9,180 - - $1,940
-
MMBtu
- -
07 3.4115: Recover and reuse cooling water $2,311 $2,500 - - - $1,340
-
Tgal
$971
-
Tgal
08 3.4155: Meter waste water $1,780 - - - - $1,780
-
Tgal
-
TOTAL RECOMMENDED $12,316 $17,812 $2,188
84,700
kWh
$4,097
-
kW-mo/yr
$1,940
-
MMBtu
$3,120
-
Tgal
$971
-
Tgal
TOTAL IMPLEMENTED $4,620 $7,142 $980
37,807
kWh
$1,329
-
kW-mo/yr
- $1,340
-
Tgal
$971
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs