ITAC Assessment: GT0576
ITAC logo
ITAC Assessment: GT0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Conduit Seal
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 7
Plant Area 30,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,993 454,279
kWh
Natural Gas $731 120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.8114: Change rate schedules or other changes in utility service $6,700 - $6,700
-
kWh
-
02 2.2437: Recover waste heat from equipment $670 $1,450 $670
35,170
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $720 $510
4,689
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $200 $2,840
25,205
kWh
-
05 3.1191: Change procedures / equipment / operating conditions $20,855 $66,000 $5,205
46,600
kWh
$15,650
-
lb
TOTAL RECOMMENDED $31,575 $68,370 $15,925
111,664
kWh
$15,650
-
lb
TOTAL IMPLEMENTED $3,350 $920 $3,350
29,894
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs