ITAC Assessment: GT0573
ITAC logo
ITAC Assessment: GT0573
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cotton/Poly Cloth
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 550,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,928,915 42,494,432
kWh
Natural Gas $185,189 58,914
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,934 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $317 $400 - $317
-
MMBtu
02 2.2522: Isolate hot or cold equipment $205 $480 $205
2,931
kWh
-
03 2.4237: Substitute compressed air cooling with water or air cooling $1,950 $6,270 $1,950
62,427
kWh
-
04 2.2136: Install / repair insulation on steam lines $2,462 $2,290 - $2,462
-
MMBtu
TOTAL RECOMMENDED $4,934 $9,440 $2,155
65,358
kWh
$2,779
-
MMBtu
TOTAL IMPLEMENTED $1,950 $6,270 $1,950
62,427
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs