ITAC Assessment: GT0569
ITAC logo
ITAC Assessment: GT0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Flour Mixes
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 130,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,151 4,267,292
kWh
Natural Gas $47,185 7,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $836,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $3,180 $18,800 $3,180
63,013
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,410 $690 $1,410
28,136
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,090 $13,600 $7,090
140,680
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,190 $200 $4,190
83,236
kWh
- -
05 2.4314: Use synthetic lubricant $1,740 - $1,740
34,584
kWh
- -
06 2.1113: Reduce combustion air flow to optimum $136 - - $136
-
MMBtu
-
07 2.7111: Reduce illumination to minimum necessary levels $1,960 $120 $1,960
38,980
kWh
- -
08 3.1191: Change procedures / equipment / operating conditions $817,000 $255,250 $(-74,000.0)
(-811,841)
kWh
- $891,000
-
lb
TOTAL RECOMMENDED $836,706 $288,660 $(-54,430.0)
(-423,212)
kWh
$136
-
MMBtu
$891,000
-
lb
TOTAL IMPLEMENTED $15,516 $33,210 $15,380
305,393
kWh
$136
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs