| Assessment Year | 1995 |
|---|---|
| Principal Product | Velvet |
| NAICS |
n/a
|
| SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
| Sales Range | $10 M to 50M |
| # of Employees | 459 |
| Plant Area |
150,000
ft2
|
| Annual Production | 15,510
thousand feet
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $627,076 | 13,909,144 |
kWh
|
$0.045 |
| Natural Gas | $400,305 | 131,329 |
MMBtu
|
$3.05 |
| LPG | $9,492 | 723 |
MMBtu
|
$13.13 |
| Fuel Oil #6 | $25,532 | 7,780 |
MMBtu
|
$3.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $311,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $294,220 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,700 | $900 | - |
$14,700
-
MMBtu
|
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $17,500 | $16,500 | - |
$17,500
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,990 | $145 |
$1,990
49,824
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,340 | $38,280 |
$18,340
419,695
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $6,420 | $45,060 |
$6,420
180,539
kWh
|
- | |
| 06 | 2.2135: Repair and eliminate steam leaks | $6,860 | $700 | - |
$6,860
-
MMBtu
|
|
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $58,060 | $37,200 |
$58,060
1,006,155
kWh
|
- | |
| 08 | 2.6218: Turn off equipment when not in use | $1,650 | - |
$1,650
12,309
kWh
|
- | |
| 09 | 3.1191: Change procedures / equipment / operating conditions | $186,200 | $100,000 |
$186,200
10,741,501
kWh
|
- | |
| TOTAL RECOMMENDED | $311,720 | $238,785 |
$272,660
12,410,023
kWh
|
$39,060
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $294,220 | $222,285 |
$272,660
12,410,023
kWh
|
$21,560
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs