ITAC Assessment: GT0565
ITAC logo
ITAC Assessment: GT0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Recreational Vehicles
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 621,100
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,222,210 23,038,687
kWh
Natural Gas $208,557 66,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $10,700 $85,490 $10,700
218,347
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,300 $5,300 $10,300
213,951
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,300 $1,300 $4,300
90,270
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $10,100 $8,480 $10,100
212,485
kWh
- -
05 2.1113: Reduce combustion air flow to optimum $8,570 $750 - $8,570
-
MMBtu
-
06 2.4314: Use synthetic lubricant $3,350 - $3,350
55,686
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $3,770 $320 $3,770
63,013
kWh
- -
08 2.7144: Install spectral reflectors / delamp $8,960 $31,380 $8,960
187,866
kWh
- -
09 2.4224: Upgrade controls on compressors $25,500 $6,300 $25,500
533,411
kWh
- -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $272,800 $20,800 - - $272,800
-
lb
TOTAL RECOMMENDED $358,350 $160,120 $76,980
1,575,029
kWh
$8,570
-
MMBtu
$272,800
-
lb
TOTAL IMPLEMENTED $36,300 $119,240 $27,730
559,496
kWh
$8,570
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs