ITAC Assessment: GT0558
ITAC logo
ITAC Assessment: GT0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product FLour Mixes
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 130,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,847 10,453,107
kWh
Natural Gas $28,182 4,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8112: Combine utility meters $12,690 $20,000 - - $12,690
02 2.3137: Use power during off-peak periods $28,400 - $28,400
-
kWh
- -
03 2.4133: Use most efficient type of electric motors $12,210 $88,380 $12,210
230,070
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,250 $1,720 $2,250
44,549
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,030 $9,070 $3,030
37,808
kWh
- -
06 2.7134: Use photocell controls $1,000 $240 $1,000
14,654
kWh
- -
07 2.7124: Make a practice of turning off lights when not needed $1,040 - $1,040
20,809
kWh
- -
08 2.7124: Make a practice of turning off lights when not needed $520 $350 $520
10,258
kWh
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,660 - $1,660
48,066
kWh
- -
10 2.2437: Recover waste heat from equipment $4,180 $2,500 - $4,180
-
MMBtu
-
TOTAL RECOMMENDED $66,980 $122,260 $50,110
406,214
kWh
$4,180
-
MMBtu
$12,690
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs