ITAC Assessment: GT0547
ITAC logo
ITAC Assessment: GT0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Granite Monuments
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 18,300
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,931 1,257,034
kWh
Natural Gas $2,648 494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $4,000 $21,180 $4,000
54,220
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,170 $400 $1,170
16,706
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $660 $1,180 $660
9,672
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $390 $300 $390
5,569
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,430 $7,800 $2,430
35,170
kWh
-
06 2.4226: Use / purchase optimum sized compressor $7,980 $13,000 $7,980
114,302
kWh
-
07 2.4226: Use / purchase optimum sized compressor $1,980 $3,250 $1,980
28,722
kWh
-
08 2.8114: Change rate schedules or other changes in utility service $2,790 - - $2,790
TOTAL RECOMMENDED $21,400 $47,110 $18,610
264,361
kWh
$2,790
TOTAL IMPLEMENTED $13,540 $34,880 $13,540
190,797
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs