ITAC Assessment: GT0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Propane Cylinders
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 1,225,000
pieces
Production Hrs. Annual 7,700
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,121 9,699,004
kWh
Natural Gas $230,543 70,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2425: Use flue gases to heat process or service water $47,900 $33,800 - $47,900
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,580 $5,030 $(-80.0)
(-2,931)
kWh
$2,660
-
MMBtu
03 2.1133: Adjust burners for efficient operation $3,540 $500 - $3,540
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $4,140 $700
28,136
kWh
-
05 2.4133: Use most efficient type of electric motors $290 $450 $290
11,723
kWh
-
TOTAL RECOMMENDED $55,010 $43,920 $910
36,928
kWh
$54,100
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs