ITAC Assessment: GT0542
ITAC logo
ITAC Assessment: GT0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fashion Accessory Pillows
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 2,400,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,697 736,811
kWh
Natural Gas $21,627 2,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $5,525 $1,200 - $5,525
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,210 $780 $1,210
11,137
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $715 $50 $715
6,448
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,760 $24,565 $8,760
80,305
kWh
-
05 2.7134: Use photocell controls $335 $200 $335
2,931
kWh
-
TOTAL RECOMMENDED $16,545 $26,795 $11,020
100,821
kWh
$5,525
-
MMBtu
TOTAL IMPLEMENTED $16,545 $26,795 $11,020
100,821
kWh
$5,525
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs