ITAC Assessment: GT0533
ITAC logo
ITAC Assessment: GT0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Milk-based Chocolate Drinks
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 115
Plant Area 200,000
ft2
Annual Production 7,500
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,872 6,984,467
kWh
Natural Gas $79,688 20,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,740 $17,700 - $3,740
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,100 $11,640 $4,100
77,081
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,610 $16,875 $7,610
143,318
kWh
-
04 2.2135: Repair and eliminate steam leaks $1,920 $300 - $1,920
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $510 $600 $380
7,327
kWh
$130
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $3,750 $680
12,896
kWh
-
TOTAL RECOMMENDED $18,560 $50,865 $12,770
240,622
kWh
$5,790
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs