ITAC Assessment: GT0528
ITAC logo
ITAC Assessment: GT0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Poultry
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 386
Plant Area 50,000
ft2
Annual Production 11,160,000
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,520 6,926,436
kWh
Natural Gas $126,862 29,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,540 $15,210 $3,540
46,893
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $730 $920 $730
9,672
kWh
-
03 2.1212: Operate boilers on high fire setting $2,500 - - $2,500
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $4,830 $10,800 - $4,830
-
MMBtu
05 2.2444: Use hot process fluids to preheat incoming process fluids $13,300 $10,000 - $13,300
-
MMBtu
06 2.2514: Cover open tanks $1,200 $2,500 - $1,200
-
MMBtu
07 2.3113: Make ice during off peak hours for cooling $42,800 $45,000 $42,800
-
kWh
-
TOTAL RECOMMENDED $68,900 $84,430 $47,070
56,565
kWh
$21,830
-
MMBtu
TOTAL IMPLEMENTED $60,370 $71,130 $47,070
56,565
kWh
$13,300
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs