ITAC Assessment: GT0527
ITAC logo
ITAC Assessment: GT0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Water-Based Adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 15
Plant Area 30,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 1,952
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,575 369,578
kWh
Natural Gas $33,460 5,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $880 $3,200 $880
8,792
kWh
- -
02 2.1231: Establish burner maintenance schedule for boilers $700 - - $700
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 - $360
3,517
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $590 $300 $590
5,862
kWh
- -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $13,000 $15,100 - $7,557
-
MMBtu
$5,443
-
Tgal
06 2.2135: Repair and eliminate steam leaks $670 $450 - $670
-
MMBtu
-
07 2.7224: Reduce space conditioning during non-working hours $190 $200 $190
6,155
kWh
- -
TOTAL RECOMMENDED $16,390 $19,250 $2,020
24,326
kWh
$8,927
-
MMBtu
$5,443
-
Tgal
TOTAL IMPLEMENTED $15,440 $18,950 $1,070
14,947
kWh
$8,927
-
MMBtu
$5,443
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs