| Assessment Year | 1994 |
|---|---|
| Principal Product | Water-Based Adhesives |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $5 M to 10M |
| # of Employees | 15 |
| Plant Area |
30,000
ft2
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 1,952
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $36,575 | 369,578 |
kWh
|
$0.099 |
| Natural Gas | $33,460 | 5,363 |
MMBtu
|
$6.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,440 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $880 | $3,200 |
$880
8,792
kWh
|
- | - | |
| 02 | 2.1231: Establish burner maintenance schedule for boilers | $700 | - | - |
$700
-
MMBtu
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $360 | - |
$360
3,517
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $590 | $300 |
$590
5,862
kWh
|
- | - | |
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $13,000 | $15,100 | - |
$7,557
-
MMBtu
|
$5,443
-
Tgal
|
|
| 06 | 2.2135: Repair and eliminate steam leaks | $670 | $450 | - |
$670
-
MMBtu
|
- | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $190 | $200 |
$190
6,155
kWh
|
- | - | |
| TOTAL RECOMMENDED | $16,390 | $19,250 |
$2,020
24,326
kWh
|
$8,927
-
MMBtu
|
$5,443
-
Tgal
|
||
| TOTAL IMPLEMENTED | $15,440 | $18,950 |
$1,070
14,947
kWh
|
$8,927
-
MMBtu
|
$5,443
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs