ITAC Assessment: GT0520
ITAC logo
ITAC Assessment: GT0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Filter Paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 106,000
ft2
Annual Production 9,600,000
lb
Production Hrs. Annual 7,560
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,355 9,280,188
kWh
Natural Gas $354,206 101,372
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,300 $9,420 $4,300
75,322
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $835 $460
8,206
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $9,900 $450 - $9,900
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $3,845 $500 - $3,845
-
MMBtu
-
05 2.2163: Use minimum steam operating pressure $2,350 - - $2,350
-
MMBtu
-
06 2.8114: Change rate schedules or other changes in utility service $20,350 - - - $20,350
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $81,750 $124,600 $81,750
1,431,712
kWh
- -
TOTAL RECOMMENDED $122,955 $135,805 $86,510
1,515,240
kWh
$16,095
-
MMBtu
$20,350
TOTAL IMPLEMENTED $38,855 $11,205 $4,760
83,528
kWh
$13,745
-
MMBtu
$20,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs