ITAC Assessment: GT0508
ITAC logo
ITAC Assessment: GT0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Gas Cutting Apparatus
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 182
Plant Area 60,000
ft2
Annual Production 220,000
pieces
Production Hrs. Annual 6,380
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,434 2,932,591
kWh
Natural Gas $7,586 1,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,615 $6,380 $4,615
73,857
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,255 $9,240 $3,255
52,169
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $1,130 $645
10,258
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,170 $1,780 $1,170
18,757
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 - $360
5,862
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,590 $7,800 $9,590
-
kWh
07 2.8114: Change rate schedules or other changes in utility service $18,900 $300 $18,900
-
kWh
TOTAL RECOMMENDED $38,535 $26,630 $38,535
160,903
kWh
TOTAL IMPLEMENTED $8,515 $16,750 $8,515
136,284
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs