ITAC Assessment: GT0505
ITAC logo
ITAC Assessment: GT0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Metal Office Furniture
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $50
M
to 100
M
# of Employees 460
Plant Area 420,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,667 9,939,918
kWh
Natural Gas $237,881 73,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $1,090 $1,600 $1,090
43,962
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $7,370 $6,400 $7,370
121,336
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,250 $830 $3,250
51,583
kWh
-
04 2.2212: Use minimum safe oven ventilation $27,755 $24,000 - $27,755
-
MMBtu
05 2.2443: Re-use or recycle hot or cold process exhaust air $47,450 $51,000 - $47,450
-
MMBtu
06 2.4133: Use most efficient type of electric motors $5,490 $21,620 $5,490
89,390
kWh
-
07 2.7231: Use radiant heater for spot heating $11,700 $80,000 - $11,700
-
MMBtu
TOTAL RECOMMENDED $104,105 $185,450 $17,200
306,271
kWh
$86,905
-
MMBtu
TOTAL IMPLEMENTED $23,410 $88,830 $11,710
216,881
kWh
$11,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs