ITAC Assessment: GT0498
ITAC logo
ITAC Assessment: GT0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cotton Cloth
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 53,300,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,219,129 33,518,465
kWh
Natural Gas $81,022 31,697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7122: Disconnect ballasts $6,945 $9,090 $6,945
190,797
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $22,915 $63,140 $22,915
629,836
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $80 $955 $80
2,345
kWh
-
04 2.7135: Install occupancy sensors $2,400 $500 $2,400
65,944
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,000 $116,200 $73,000
2,006,155
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,655 $37,220 $9,655
265,240
kWh
-
07 2.1221: Replace obsolete burners with more efficient ones $2,240 $6,000 - $2,240
-
MMBtu
TOTAL RECOMMENDED $117,235 $233,105 $114,995
3,160,317
kWh
$2,240
-
MMBtu
TOTAL IMPLEMENTED $112,515 $225,650 $112,515
3,092,028
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs