ITAC Assessment: GT0482
ITAC logo
ITAC Assessment: GT0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product KILN-DRIED LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area
n/a
Annual Production 100,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $935,593 13,698,711
kWh
Natural Gas $12,722 2,176
MMBtu
Fuel Oil #2 $52,722 9,553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $163,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $8,400 $190,520 $8,400
124,560
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,250 - $11,250
164,713
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $2,520 $961
14,068
kWh
- $(-146.0)
04 2.7111: Reduce illumination to minimum necessary levels $1,390 $1,250 $1,390
20,516
kWh
- -
05 2.7122: Disconnect ballasts $400 - $400
5,862
kWh
- -
06 2.3192: Use fossil fuel powered generator during peak demand periods $141,380 $750,000 $156,000
150,059
kWh
$(-9,620.0)
-
MMBtu
$(-5,000.0)
TOTAL RECOMMENDED $163,635 $944,290 $178,401
479,778
kWh
$(-9,620.0)
-
MMBtu
$(-5,146.0)
TOTAL IMPLEMENTED $163,635 $944,290 $178,401
479,778
kWh
$(-9,620.0)
-
MMBtu
$(-5,146.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings