Assessment Year | 1992 |
---|---|
Principal Product | RUBBER AUTO PARTS |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 6,500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $293,320 | 4,541,325 |
kWh
|
$0.065 |
Natural Gas | $216,154 | 56,872 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,279 | $9,740 |
$2,601
40,152
kWh
|
- | $(-322.0) | |
02 | 2.7122: Disconnect ballasts | $310 | $320 |
$310
4,689
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,790 | $2,980 |
$1,790
27,843
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $848 | $24,790 |
$848
13,189
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,776 | $150 |
$3,776
58,324
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,747 | $450 | - |
$7,197
-
MMBtu
|
$(-450.0) | |
07 | 2.2135: Repair and eliminate steam leaks | $36,000 | $3,380 | - |
$36,000
-
MMBtu
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $980 | $1,880 | - |
$980
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $52,730 | $43,690 |
$9,325
144,197
kWh
|
$44,177
-
MMBtu
|
$(-772.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs