Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RUBBER AUTO PARTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 6,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,320 4,541,325
kWh
Natural Gas $216,154 56,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,279 $9,740 $2,601
40,152
kWh
- $(-322.0)
02 2.7122: Disconnect ballasts $310 $320 $310
4,689
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,790 $2,980 $1,790
27,843
kWh
- -
04 2.4133: Use most efficient type of electric motors $848 $24,790 $848
13,189
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,776 $150 $3,776
58,324
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $6,747 $450 - $7,197
-
MMBtu
$(-450.0)
07 2.2135: Repair and eliminate steam leaks $36,000 $3,380 - $36,000
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $980 $1,880 - $980
-
MMBtu
-
TOTAL RECOMMENDED $52,730 $43,690 $9,325
144,197
kWh
$44,177
-
MMBtu
$(-772.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs