ITAC Assessment: GT0473
ITAC logo
ITAC Assessment: GT0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALLOY CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 226
Plant Area
n/a
Annual Production 7,000
ton
Production Hrs. Annual 7,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,327 16,309,789
kWh
Natural Gas $209,212 48,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $390 $21,630 $390
12,896
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $300 - $300
9,965
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,770 $10,000 $14,770
485,932
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $10,180 $9,000 - $10,180
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $9,040 $5,100 - $9,040
-
MMBtu
06 2.1122: Re-size charging openings or add a movable door on equipment $200 $1,015 - $200
-
MMBtu
TOTAL RECOMMENDED $34,880 $46,745 $15,460
508,793
kWh
$19,420
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs