ITAC Assessment: GT0454
ITAC logo
ITAC Assessment: GT0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WOODYARD CHIPPING SYSTEM
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area
n/a
Annual Production 10
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,516 1,367,526
kWh
LPG $14,697 1,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $61 $8,000 $215
2,638
kWh
- $(-154.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $489 $11,450 $556
5,569
kWh
- $(-67.0)
03 2.4133: Use most efficient type of electric motors $130 $5,350 $130
1,465
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $104 - $104
1,172
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,968 $1,500 $1,968
22,860
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,240 $9,000 - $2,240
-
MMBtu
-
TOTAL RECOMMENDED $4,992 $35,300 $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221.0)
TOTAL IMPLEMENTED $4,992 $35,300 $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs