| Assessment Year | 1991 |
|---|---|
| Principal Product | FRUIT PACKING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3565: Packaging Machinery |
| Sales Range | $10 M to 50M |
| # of Employees | 108 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,153 | 660,317 |
kWh
|
$0.084 |
| LPG | $18,688 | 1,835 |
MMBtu
|
$10.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,780 | $22,892 |
$8,780
105,217
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $269 | $143 |
$269
3,224
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $753 | $300 | - |
$753
-
MMBtu
|
|
| 04 | 2.2162: Reduce excess steam bleeding | $2,230 | - | - |
$2,230
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $647 | - |
$647
7,913
kWh
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $641 | $500 | - |
$641
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,320 | $23,835 |
$9,696
116,354
kWh
|
$3,624
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs