ITAC Assessment: GT0447
ITAC logo
ITAC Assessment: GT0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PROCESSED CHICKENS
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 950
Plant Area
n/a
Annual Production 234,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,564,805 28,439,332
kWh
Natural Gas $154,531 68,129
MMBtu
Fuel Oil #2 $2,440 352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $9,880 $500 - $9,880
-
MMBtu
02 2.2511: Insulate bare equipment $534 $1,330 - $534
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $754 $150 - $754
-
MMBtu
04 2.4133: Use most efficient type of electric motors $5,147 $5,838 $5,147
93,494
kWh
-
05 2.2447: Heat water with exhaust heat $60,730 $125,000 - $60,730
-
MMBtu
TOTAL RECOMMENDED $77,045 $132,818 $5,147
93,494
kWh
$71,898
-
MMBtu
TOTAL IMPLEMENTED $77,045 $132,818 $5,147
93,494
kWh
$71,898
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs