ITAC Assessment: GT0443
ITAC logo
ITAC Assessment: GT0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ASSEMBLED FURNITURE
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,245 846,717
kWh
Natural Gas $2,629 499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,345 $2,360 $1,345
14,654
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,068 $374 $1,068
12,016
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $660 $150 $660
7,327
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $140 $100 $140
1,465
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $2,000 $3,980 $2,000
21,981
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $1,280 $7,600 $(-60.0)
(-2,345)
kWh
$1,340
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $1,460 $1,150 $1,460
16,120
kWh
-
TOTAL RECOMMENDED $7,953 $15,714 $6,613
71,218
kWh
$1,340
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs